New Climate Control System Installed in Tenerife’s Hospital Doctor José Molina Orosa
After months of anticipation, the Hospital Doctor José Molina Orosa in Arrecife, Tenerife, is seeing the installation of a state-of-the-art climate control system, funded by a 1.82 million euro budget. According to José Ramón Sánchez López, the project is well underway this week with the installation of two advanced water-cooling units, which promise improved efficiency and lower noise levels.

The new system will significantly enhance the hospital’s ability to maintain a comfortable and safe environment for both patients and staff. For expats and digital nomads living in or near Santa Cruz de Tenerife, this means the hospital will be better equipped to handle the island’s tropical climate, providing a more pleasant experience for those seeking medical care.
This upgrade is not just about comfort; it’s a practical move to ensure that the hospital can operate more efficiently and effectively, which is a positive development for anyone relying on healthcare services on the island.
帮助我们改进信息内容
感谢你帮助我们保持 ExpatsList 内容的准确与可信。我们将在 24 小时内审核你的报告。
出了点问题,请重试,或直接与我们联系。
请登录后再报告问题。这有助于我们在需要时跟进你的报告。